High quality Chemical Manufacturer
National consultation hotline: +86 021-64208466

Automotive Interior – Polyurethane Adhesive

1. Core CharacteristicsTable 1: Basic Physical PropertiesParameterSpecification RangeTest

Email: info@standard-groups.com

Content

1. Core Characteristics

Table 1: Basic Physical Properties

ParameterSpecification RangeTest Method
Viscosity (25°C)3.000-50.000 cPBrookfield
Cure Time (min)5-120ASTM D2471
Tensile Strength5-15 MPaISO 527
Elongation150-600%ISO 527
Peel Strength4-8 N/mmASTM D1876
Service Temp-40°C to +120°CISO 6722
Density1.05-1.25 g/cm³ASTM D792

2. Application-Specific Formulations

Table 2: Adhesive Types by Interior Component

ComponentAdhesive TypeKey Requirements
HeadlinersLow-odor 1K PUMinimal VOC, high tack
Door Panels2K structural PUHigh strength, fast cure
DashboardsElastic PUVibration damping
Seat CoversSprayable PUFlame retardant
CarpetsWater-based PULow temperature cure
Trim PartsInstant-grab PURepositionable

3. Performance Comparison

Table 3: PU vs Alternative Interior Adhesives

PropertyPU AdhesiveHot MeltEpoxyAcrylic
Flexibility★★★★★★★★★★
Vibration Resistance★★★★★★★★★★★★★★
Gap Filling★★★★★★★★★
Temperature Range★★★★★★★★★★★★
Substrate Versatility★★★★★★★★★★★★★★★★
Cure Speed★★★★★★★★★★★★★★★★

4. Manufacturing Requirements

Surface Preparation:

  • Plasma treatment for plastics
  • Solvent wiping for metals
  • Light abrasion for textiles

Application Methods:

  • Robotic dispensing
  • Roll coating
  • Spray application
  • Bead extrusion

Curing Conditions:

  • Temperature: 20-80°C
  • Humidity: 40-70% RH
  • Pressure: 0.1-0.5 MPa

5. Automotive Standards Compliance

StandardRequirementPU Adhesive Performance
ISO 6722Temperature resistanceExceeds requirements
SAE J2230Fogging test<2mg (Class A)
VDA 270Odor testingScore 3-4
FMVSS 302FlammabilitySelf-extinguishing
ELV DirectiveHeavy metalsFully compliant

6. Recent Technological Advances

  • Low-VOC formulations meeting global emission standards
  • Fast-cure systems for production line efficiency
  • Thermal-conductive grades for EV battery components
  • Self-healing versions for long-term durability
  • Bio-based polyols for sustainable solutions

7. Processing Guidelines

ParameterOptimal Range
Pot Life10-90 minutes
Open Time1-15 minutes
Clamping Pressure0.05-0.3 MPa
Fixture Time2-30 minutes
Full Cure6-48 hours
Recoat Window30-120 minutes

8. Failure Prevention

Common Issues:

  • Bubble formation (control humidity)
  • Poor wetting (ensure surface energy >36 dynes/cm)
  • Delamination (verify substrate compatibility)
  • Cure inhibition (avoid silicone contamination)

Quality Control Measures:

  • Rheology testing
  • FTIR verification
  • Lap shear testing
  • Accelerated aging tests

Disclaimer: The above content is for reference and communication only among industry insiders, and does not guarantee its accuracy or completeness. According to relevant laws and regulations and the regulations of this website, units or individuals who purchase related items should obtain valid qualifications and qualification conditions.


Online Message

Contact Details

Company Phone

+86-21-6420 0566

Working hours

Monday to Friday

Mobile phone:

13816217984

Email:

info@qinsun-lab.com

QR code